The project is implemented within the framework of the grant competition: "Community Sparks: Partnership of ISAR Ednannia and GlobalGiving for Resilience."
The project "Modernization of the Lighting System in the Shelter of Kindergarten No. 57 in Chernihiv, Providing Backup Power Supply" is aimed at improving safety conditions and creating appropriate environments for children and staff in the shelter.
Within the project, the modernization of the existing lighting system in the shelter is planned in accordance with modern safety requirements. Special attention is paid to the implementation of a backup power system, which will ensure the uninterrupted operation of lighting even in the event of power outages.
Creating a safe space that will provide:• Appropriate conditions for 116 children;• An increased level of safety, particularly for children with special educational needs;• Stable lighting even during power outages.
When the siren sounds, the level of danger rises. High-quality and reliable lighting is a vital element in providing a sense of safety and calm.
The project is implemented in stages:
Preparatory Stage
Technical specifications have been clarified, and a technical work plan has been prepared.
Modernization of the Power Grid
The electrical wiring has been replaced to ensure compliance with safety requirements, and the system has been prepared for the installation of new lighting.
Installation of Backup Power and LED Lighting in the Shelter
Light fixtures providing the appropriate level of illumination have been installed. The backup power source has been installed and tested.
Presentation of Results to Staff and Parents
Holding an information meeting for educators and parents to present the results of the modernization.
Project implementation period: from 01.04.2026 to 31.07.2026